Detailed Design
During the detailed design phase, the finer elements of the facility were finalized. The drawings below were at 75% completion, with many of the key features taking shape. The project is now in the construction stage.
Major Project Milestones:
View from Highway
Wave Pool and Slides
Competition Pool
Arena View Toward Lobby
Lobby Viewing to Pool
Lobby View to Arena
Contact Us
City of Prince Albert
1084 Central Avenue
Prince Albert, SK S6V 7P3
Phone: 306-953-4884
After Hours Emergency: 306-953-4348
Email Us