Master Specifications - full document
Division 1: General Requirements
- Section 01005 General Instructions
- Section 01014 Project Control and Milestones
- Section 01230 Alternates
- Section 01330 Submittals
- Section 01450 Quality Control
- Section 01500 Temporary Facilities and Controls
- Section 01560 Environmental Protection
Division 2: Site Work
- Section 02055 Soils Information
- Section 02210 Park Grading
- Section 02212 Topsoil
- Section 02315 Trenching, Backfilling, and Compaction for Utilities
- Section 02335 Site Excavation, Embankment and Compaction
- Section 02510 Water Distribution
- Section 02536 Manholes
- Section 02537 Sanitary Sewers
- Section 02539 Building Services
- Section 02631 Catch Basins, Grates and Frames
- Section 02635 Storm Drainage Pipe and Fittings
- Section 02636 Perforated Subdrain
- Section 02705 Subgrade Construction
- Section 02706 Geosynthetics for Roadways
- Section 02721 Granular Base Course
- Section 02741 Hot Mix Asphalt Pavement
- Section 02745 Prime, Tack and Fog Coats
- Section 02751 Concrete Pavement
- Section 02770 Concrete Sidewalks, Curbs and Gutters
- Section 02800 CCTV Sewer Inspection
- Section 02810 Irrigation
- Section 02840 Adjustment of Appurtenances
- Section 02933 Seeding
- Section 02950 Plant Material
- Section 02998 Landscape Maintenance
Division 3: Concrete
- Section 03100 Concrete Formwork
- Section 03200 Concrete Reinforcement
- Section 03300 Cast-In-Place Concrete